Quantcast
Channel: SCN : Discussion List - SAP LT Replication Server
Viewing all articles
Browse latest Browse all 562

Upgrade Pre-Requisite

$
0
0

Hi,

We have a scenario where our ECC landscape is going under an upgrade.

In this scenario, do we need to Stop the replication Jobs from SLT side.

Since the ECC upgrade is going on a shadow instance, we have a plan to stop the SLT replication (master Job) just before the down-time starts for ECC. For other Pre-processing steps for ECC upgrade, can SLT master jobs  can be switched on ?

 

Thanks

Mrityunjay


Viewing all articles
Browse latest Browse all 562

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>