Hi Experts,
Can you please let me know your views on below two pointers?
1. as per new features of DMIS 2011 SP08,
a. replication into SAP ABAP-based system(table based)
b. replication into SAP ABAP- based system into Application layer is technically possible.
query1 - so if I want to carry out replication from Hana to ECC for tables only, what are the steps to be followed?
query 2- what are the limitations for scenario(b) mentioned above?
2. 'Load' option is a one time event wherein, complete records of data flow into destination target and then stops.
query 3- suppose if I want to carry out full load on a daily basis for some tables, can SLT be used in this case?
Kindly suggest.
Regards,
Saritha